banner

The certification service for new installations refers to the inspection activity of fuel gas supply installations corresponding to the design and construction stages of new installations before they are put into service. It must be carried out by an Accredited Certification Body or Accredited Inspection Body -OCA / OIA- accredited by the ONAC for this activity.

Requirements for Certification and commissioning

Home and commercial installations
  • Material certificate.
  • Technical report with a detailed description of the fuel gas supply facilities project and the respective plans signed by a professional, registered and with a valid professional card or by a competent person (Res 90902 of 2013).
  • Certificate of delivery of the individual line of the gas installation.
  • Approval by the distributor, in this case Llanogas, accompanied by a concept on the availability of the provision of the fuel gas public service at the installation construction site (Res 90902 of 2013)
  • Certificate of labor competence of the Installer
Industrial facilities according to Res.90902 of 2013
  • Compliance with the technical requirements indicated in NTC 4282 "Installations for gas supply for industrial use"
  • Material certificate
  • Technical report with a detailed description of the fuel gas supply facilities project and the respective plans signed by a professional, registered and with a valid professional card or by a competent person (Res 90902 of 2013).
  • Certificate of delivery of the individual line of the gas installation.
  • Approval by the distributor, in this case Llanogas, accompanied by a concept on the availability of the provision of the fuel gas public service at the installation construction site (Res 90902 of 2013).
  • Certificate of labor competence of the Installer.

Nota: In case of making any modification to your installation that affects the size, total capacity or method of operation of the equipment, you must immediately request the certification of the installation.

Request your certification visit for a new installation.

Consejos de seguridad