Prevent damage in the networks

Gas Pipeline Damage Prevention Program

Before carrying out any work on sidewalks of properties or in lots, intervention on the ground must be coordinated with Llanogas to avoid damage to gas pipelines.

If you are going to remodel the facade, change your sidewalk's flooring, do gardening work, burning or clearing in lots, install poles, build houses (footings or columns near sidewalks), install other networks (water, energy, telephony), electrical or sewage inspection boxes, or other activities that involve excavation, keep in mind that gas networks run beneath your house's construction.

If you are going to carry out works that might interfere with the gas network, request our free assistance and information about the networks. You must make this request at least 3 days before the start of the works. If you have already started the work, you must request assistance as soon as possible to avoid damage to the network and affecting the community.

banner